Empire Metals Limited (AIM: EEE) has published its interim results for the six months ended 30 June 2026, reporting a period of significant operational progress at its flagship Pitfield Titanium Project in Western Australia. The headline development, confirmed post-period end, is an upgraded Mineral Resource Estimate of 8.16 billion tonnes at 4.3% TiO₂ for 349 million tonnes of contained TiO₂, establishing Pitfield as the world's largest titanium resource. The group ended the period with cash of £12.4 million following an £8 million institutional subscription completed in May 2026, supporting ongoing development workstreams.
Key Points
- Empire Metals Limited (AIM: EEE; OTCQX: EPMLF) — AIM-quoted exploration and development company focused on the Pitfield Titanium Project, Western Australia
- Upgraded MRE of 8.16 billion tonnes at 4.3% TiO₂ confirmed post-period end, including Pitfield's first Measured Resource of 374 million tonnes at 5.8% TiO₂
- Cash of £12.4 million at 30 June 2026; period loss of £1,880,039; £8 million raised via institutional subscription at 30 pence per share; Eclipse Mining Lease sold for A$750,000
- Investors will be watching progress on mine planning studies, planned ASX dual listing in H2 2026, and pilot-scale metallurgical testwork ahead of feasibility studies
Pitfield Drilling Campaign Delivers 712 Holes and Record TiO₂ Intercept Grades at Thomas Prospect
The largest drilling programme in Empire's history comprised 712 holes for 34,844 metres, more than doubling cumulative drilling at Pitfield to 67,846 metres across 1,102 holes. Results from the Thomas Prospect were particularly notable, with multiple drillholes averaging close to or above 8% TiO₂, including intercepts of 51m at 8.79% TiO₂, 50m at 8.29% TiO₂, and 48m at 7.90% TiO₂, each from surface, alongside a peak intercept of 2m at 21.44% TiO₂. The high-grade weathered core at Thomas extends over approximately 6.25km², with 120 drillholes returning average grades above 6% TiO₂ across their full drilled length, underpinning the upgraded post-period MRE.
Integrated Metallurgical Flowsheet Targets 99%-Plus TiO₂ Pigment and Titanium Sponge Feedstock
Empire announced in June 2026 the completion of an integrated metallurgical processing flowsheet built entirely on conventional processing technologies. Bench-scale testwork confirmed selective recovery of titanium minerals via whole-of-ore flotation, rejecting more than 90% of unwanted gangue material and achieving concentrate grades above 34% TiO₂. Titanium extractions of up to 98% have been achieved through an acid bake-water leach process. The flowsheet also demonstrated the potential for a high-grade alumina by-product grading 98.7% Al₂O₃, which the company states could lower reagent costs and reduce waste whilst improving TiO₂ recovery. Continuous pilot-scale testwork is planned ahead of feasibility studies.
£8 Million Subscription and A$750,000 Eclipse Divestment Strengthen Empire's £12.4 Million Cash Position
Empire's cash and cash equivalents stood at £12.4 million at 30 June 2026, compared with £6.3 million at 30 June 2025. The improvement reflects £8 million of gross proceeds raised in May 2026 through the issue of 26,666,667 new ordinary shares to existing institutional shareholders at 30 pence per share. The company also completed the sale of its 75% interest in the non-core Eclipse Mining Lease for total consideration of A$750,000, concluding the rationalisation of its gold interests. The group reported a pre-tax loss of £1,879,822 for the period, consistent with its status as a pre-revenue exploration and development company.
ASX Dual Listing Targeted for H2 2026 as Empire Advances Pitfield Towards Feasibility Stage
Empire has appointed Zeus Capital Limited as joint corporate broker alongside existing advisers Canaccord Genuity Limited and S. P. Angel Corporate Finance LLP. A dual listing on the Australian Securities Exchange remains on schedule for H2 2026, led by Canaccord Genuity (Australia), intended to broaden access to Australian and international investors. Post-period appointments include Chris Dodds as General Manager (Project Delivery), with more than 20 years of complex mining project experience, and Emma Neale as Senior Advisor (Approvals), with more than 14 years of environmental permitting experience in Western Australia. A further MRE upgrade targeting conversion of additional Indicated Resources to Measured category is planned for mid-2027, the announcement states.



Please wait processing your request...