First Development Resources plc (AIM: FDR), an Australia-focused exploration company listed on AIM, has confirmed the completion of Phase I, Stage II reverse circulation drilling at its Lander West Gold Project in Australia's Northern Territory. A total of 16 holes were drilled across 1,605 metres, testing extensions to gold mineralisation confirmed during Stage I. The programme concluded one day ahead of schedule owing to severe weather approaching the area, with samples now being prepared for delivery to Adelaide for assay analysis. Investors will be watching for laboratory results, which the company states will be reported in due course.
Key Points
- First Development Resources plc (AIM: FDR) — Australia-focused mineral exploration company with assets in the Northern Territory and Western Australia
- Phase I, Stage II RC drilling programme completed at Lander West Gold Project, Northern Territory, with 16 holes drilled totalling 1,605 metres
- Stage I previously confirmed bedrock gold mineralisation, including 7 metres at 0.40 g/t gold from 50 metres downhole, and 2 metres at 0.98 g/t gold in hole 26LWR08
- Investors should watch for assay results from samples being sent to Adelaide, which will determine whether Stage II testing identified higher grades, greater thickness, or mineralisation continuity
Stage II Drilling Targets Extensions and Red Handed Magnetic Features at Lander West
The Stage II programme at Lander West was specifically designed to test along-strike and down-dip extensions to priority targets established during Stage I, as well as additional magnetic targets within the Red Handed target area. The 16-hole, 1,605-metre reverse circulation campaign sought evidence of higher gold grades, greater mineralised thickness, and structural continuity — building directly on Stage I results that confirmed gold mineralisation in bedrock. Drilling was carried out by Bullion Drilling, with the company's CEO, Tristan Pottas, noting in the announcement that the crew's performance was commendable throughout the programme.
Stage I Confirmed Bedrock Gold at Lander West, Including 0.98 g/t Over 2 Metres in Hole 26LWR08
Stage I established the geological foundation for Stage II by confirming gold mineralisation in bedrock at Lander West. The announcement references a headline intercept of 7 metres at 0.40 grammes per tonne gold from 50 metres downhole, which included a higher-grade interval of 2 metres at 0.98 grammes per tonne gold in hole 26LWR08. These results identified Lander West as a priority target within FDR's broader Northern Territory portfolio, which also encompasses copper, uranium, and rare-earth element targets, alongside the Wallal Project in Western Australia.
Severe Weather Curtails Final Day of Drilling; Samples Dispatched to Adelaide for Analysis
The drilling programme concluded one day earlier than planned due to severe weather conditions approaching the Lander West site. Despite this, the company confirmed the programme's objectives were met before the early close. Samples are now being prepared for delivery to Adelaide, where laboratory assay analysis will take place. The technical information in the announcement was reviewed and approved by qualified geologist Mr Nicholas O'Reilly of Mining Analyst Consulting Ltd, acting as Qualified Person under the AIM Rules for Mining and Oil & Gas Companies. Results will be disclosed to shareholders once available.



Please wait processing your request...