Fortuna Mining Corp. (NYSE: FSM | TSX: FVI), traded on the London market under ticker reference 0QYM, has published positive results from its feasibility study for the Diamba Sud Gold Project in Senegal, confirming an after-tax net present value of $1.009 billion at a 5% discount rate and an internal rate of return of 60% at a gold price of $3,500 per ounce. The study outlines a 9.4-year open-pit, carbon-in-leach gold mine with a one-year payback period and an initial Capital requirement of $397.5 million, which the company states is fully covered by its existing Liquidity. With an environmental decree already secured from the Senegalese government and a final Investment decision contingent only on receipt of the mining permit, the announcement positions Diamba Sud as a cornerstone of Fortuna's ambition to grow annual gold production to more than 500,000 ounces by 2028.
Key Points
- Fortuna Mining Corp., ticker reference 0QYM, has completed a positive feasibility study for the Diamba Sud Gold Project in Senegal
- After-tax NPV of $1.009 billion at a 5% discount rate and IRR of 60% at $3,500/oz gold; returns improve to NPV of $1.3 billion and IRR of 72% at $4,000/oz
- Initial Capital Expenditure of $397.5 million; company states liquidity exceeds $800 million as at 31 March 2026
- Average annual gold production of 158,000 ounces over the first four years; life-of-mine average of 116,000 ounces per year over 9.4 years
- All-In Sustaining Cost of $1,056/oz over the first four years and $1,332/oz over the life of mine
- First gold targeted by Q2 2028, subject to receipt of the mining permit and a final investment decision
- Investors should watch for the mining permit award from the Senegalese government and any subsequent final investment decision announcement
Diamba Sud Feasibility Study Returns Billion-Dollar After-Tax NPV for Fortuna Mining
The feasibility study, published on 29 June 2026, was prepared by Fortuna and supported by a team of independent industry experts including Lycopodium, Knight Piesold, Kenmore Mine Consulting, SOJUFISC, Infinity Corporate Finance, Piteau Associates, Entech, and Earth Systems. The study supersedes the preliminary economic assessment dated 15 October 2025 and represents a materially higher-confidence engineering basis, consistent with an Association for the Advancement of Cost Engineering Class 3 estimate, which the company states typically corresponds to an accuracy range of approximately -10% to +15%.
At the study's base case gold price of $3,500 per ounce, the project generates an after-tax NPV at a 5% discount rate of $1.009 billion, a pre-tax NPV of $1.379 billion, and an after-tax IRR of 60%, with a one-year payback period. Should the gold price rise to $4,000 per ounce, the announcement states that the after-tax NPV increases to $1.3 billion, the IRR rises to 72%, and the payback shortens to eleven months. Average EBITDA over the life of mine is estimated at $258 million per year, rising to $398 million per year over the first four years of production.
Production Profile Shows 158,000 Ounces Per Year in High-Grade Opening Years
The feasibility study outlines total gold production of 1.053 million ounces over the 9.4-year mine life, from 20.5 million tonnes of ore at an average head grade of 1.75 grammes per tonne gold and a metallurgical recovery of 91%. The mine plan encompasses seven deposits: Area A, Area D, Karakara, Kassasoko, Moungoundi, Southern Arc, and Western Splay. Mining is sequenced to front-load higher-grade ore, with year one alone forecast to produce 184,000 ounces of gold at a head grade of 2.85 g/t.
The first four years are expected to deliver average annual gold production of 158,000 ounces, which the announcement describes as the project's "strong first four years" performance window, with AISC of $1,056 per ounce over that period. The overall life-of-mine average annual production stands at 116,000 ounces at an AISC of $1,332 per ounce. Total waste mined over the LOM is 129.6 million tonnes, producing a strip ratio of 6.3:1.
Low-Cost Operating Structure Anchors the Economic Case at Diamba Sud
The feasibility study estimates total direct operating costs of $58.86 per tonne milled, equivalent to $1,146 per ounce of gold produced over the life of mine. Mining costs account for $34.70 per tonne mined, processing costs for $16.09 per tonne processed, and general and administrative costs for $8.65 per tonne processed. After adding refining, royalties, a social development fund contribution, and sustaining capital, the all-in sustaining cost reaches $1,332 per ounce over the life of mine.
The announcement describes Diamba Sud as expected to be Fortuna's lowest-cost mine, a claim supported by the first-four-year AISC of $1,056 per ounce. Royalties payable to the Senegalese state are stated at a rate of 3.5%, and sustaining capital over the LOM is estimated at $64.0 million, with an additional $14.5 million allocated for closure costs. These cost assumptions are based on the Mining Convention between Boya S.A. and the State of Senegal dated 8 April 2015, though the company notes there can be no assurance that provisions will not be renegotiated as part of the exploitation permit approval process.
$397.5 Million Initial Capital Outlay Funded from Fortuna's Existing Liquidity
The total initial capital required to develop Diamba Sud is estimated at $397.5 million, comprising construction costs of $284.6 million, pre-production costs excluding mining of $37.7 million, pre-stripping of $34.4 million, contingency of $33.7 million, and Withholding taxes, duties, and levies of $7.0 million. The company states that funding has been secured through its strong Cash Flow generation and a liquidity position of over $800 million as at 31 March 2026.
The capital cost estimate assumes an Engineering, Procurement, Construction, and Management delivery model. The company notes that the increase in capital costs relative to the earlier PEA reflects the incorporation of local content requirements and Senegalese regulations, higher material quantities derived from more advanced engineering, additional ground improvement requirements, scope growth associated with the expanded resource base, increased tailings storage and infrastructure requirements, and additional pre-stripping, haulage roads, and water management works linked to bringing the Southern Arc deposit forward in the mine plan. Key quantities for major scopes including steelwork, concrete, and overland piping are now derived from 3D models, and major mechanical equipment pricing is supported by Quotation-based inputs.
Maiden Probable Mineral Reserve of 1.15 Million Ounces Established Across Seven Deposits
The feasibility study establishes the maiden Mineral Reserve estimate for Diamba Sud, totalling 20.5 million tonnes at an average grade of 1.75 g/t gold, containing 1.151 million ounces of gold, all classified as Probable Mineral Reserves. The reserve is spread across seven deposits, with Southern Arc being the highest-grade contributor at 4.464 million tonnes at 2.31 g/t gold, containing 332,000 ounces. Area A and Area D together contribute 9.239 million tonnes at 1.65 g/t gold, containing 490,000 ounces combined. Mineral Reserves are reported as at 10 April 2026.
In addition to the Probable Mineral Reserves, Mineral Resources exclusive of reserves total 3.364 million tonnes at 1.12 g/t gold, containing 121,000 ounces in the Indicated category, and a further 1.632 million tonnes at 1.30 g/t gold, containing 68,000 ounces in the Inferred category. The announcement notes that Diamba Sud remains open for further growth, particularly at Southern Arc, where recent drilling indicates the potential to extend mineralisation. Eric Chapman, a full-time Fortuna employee, is named as the Qualified Person responsible for Mineral Resources, and Raul Espinoza, also a full-time Fortuna employee, is responsible for Mineral Reserves.
How the 2026 Feasibility Study Improves on Fortuna's 2025 Preliminary Economic Assessment
The 2026 feasibility study represents a meaningful upgrade in project definition and economic confidence relative to the PEA published in October 2025. Average annual gold production has increased from 106,000 ounces per year in the PEA to 116,000 ounces per year in the feasibility study, with first-four-year production rising from 147,000 ounces per year to 158,000 ounces per year. Mine life has been extended from 8.1 years to 9.4 years, and the average feed grade has improved from 1.63 g/t gold to 1.75 g/t gold.
Metallurgical recoveries have also been marginally improved, from 90% in the PEA to 91% in the feasibility study. The company states that the higher-confidence cost and execution basis of the feasibility study reduces execution risk, supported by early works activities already under way including camp construction, office facilities, and a new site access road. A letter of intent has been executed with African Power Services as the power station EPC contractor to secure heavy-fuel oil and light-fuel oil generators, and front-end engineering design is being completed to support early procurement of critical-path equipment including the SAG mill.
Mining Method, Processing Plant Design, and Infrastructure Layout at Diamba Sud
The feasibility study outlines a conventional open-pit operation using drill-and-blast methods for both oxide and fresh ore, followed by truck-and-shovel mining. Ore will be processed through a conventional carbon-in-leach plant designed to produce gold doré, incorporating crushing, milling, gravity recovery, CIL processing, carbon elution, and gold recovery. The process plant is designed to treat oxide ore at up to 2.5 million tonnes per annum and fresh ore at a nameplate capacity of 2.0 million tonnes per annum, with an average annual processing rate of approximately 2.26 million tonnes.
The project site is located in the Kédougou Region of southeastern Senegal, approximately 665 kilometres southeast of Dakar and 83 kilometres northeast of Kédougou. The project is operated by Boya S.A., a wholly owned indirect Subsidiary of Fortuna. Power will be supplied through a hybrid solution comprising heavy-fuel oil generation, solar photovoltaic, and battery energy storage system components, with solar integration targeted during the first year of operations. The tailings storage Facility has been designed in accordance with the Global Industry Standard on Tailings Management and will be constructed using the Downstream methodology, accommodating 20.5 million tonnes over the life of mine.
Senegalese Government Ownership Structure and Regulatory Milestones
The project structure involves a degree of state participation. Upon the granting of an exploitation permit, the State of Senegal will assume a 10% free-carried ownership interest in the project, with the right for the state to acquire an additional contributory interest of up to 25%. All financial returns presented in the feasibility study are on a 100% ownership basis. The economic analysis assumes that royalties, taxes, and incentives will be applied in accordance with the Mining Convention between Boya S.A. and the State of Senegal dated 8 April 2015.
A significant regulatory milestone has already been achieved, with the company stating that the environmental decree from the Senegalese government has been received. The outstanding requirement before a final investment decision can be taken is the receipt of the mining permit. The company has applied for an exploitation permit for the project, and the announcement cautions that if the permit is not granted, it would have a material impact on the potential development of the project. The announcement states that first gold production is targeted for Q2 2028, conditional on a timely final investment decision.
Diamba Sud's Role in Fortuna's 500,000-Ounce Production Growth Target for 2028
The company's President and Chief Executive Officer, Jorge A. Ganoza, is quoted in the announcement as stating that Diamba Sud, together with the Séguéla mine expansion, supports a plan to grow Fortuna's annual gold production rate by approximately 60% to more than 500,000 ounces in 2028. Mr Ganoza is further quoted as saying that with the environmental decree received and the feasibility study complete, the company is "ready to move Diamba Sud toward a final investment decision upon completion of the mining permit process." These statements are taken directly from the announcement and represent forward-looking guidance from management.
Investors may be watching closely for any update on the timeline for the mining permit process in Senegal, given that the feasibility study is otherwise complete and early works are already under way. The immediate share price impact was not clear from available public information at the time of publication. The announcement did not provide updated group-level production or financial guidance beyond the project-specific figures contained in the feasibility study. The disclosure suggests that Fortuna views Diamba Sud as a foundational growth asset, with the low-cost profile, strong early-year returns, and continued exploration upside representing the key investment thesis for the project.
Exploration Upside and Potential for Mine Life Extension at Southern Arc and Beyond
The feasibility study mine plan is based solely on the current Probable Mineral Reserve estimate, with the company noting that additional opportunities remain to convert the existing Mineral Resources into Mineral Reserves and to expand the resource base through continued drilling. Ongoing drilling is expected to test open extensions, improve geological confidence in areas currently classified as Inferred Resources, and identify additional mineralisation beyond the current mine plan. The announcement specifically highlights Southern Arc, where recent drilling indicates the potential to extend mineralisation.
Since 2023, Fortuna states it has invested meaningfully in mineral exploration at Diamba Sud, with the growth reflected in the maiden Mineral Reserve estimate. The combined Inferred Resource of 1.632 million tonnes at 1.30 g/t gold, containing 68,000 ounces, and Indicated Resource of 3.364 million tonnes at 1.12 g/t gold, containing 121,000 ounces, exclusive of reserves, provide a pipeline of material that could support future upgrade drilling campaigns. The company describes this as "a clear pathway to potentially extend mine life, enhance future production, and increase the overall value of the Project," though it cautions that Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.