GoldStone Resources Limited (AIM: GRL), an AIM-quoted gold producer operating in Ghana, West Africa, has provided an update on pit-definition drilling at its Homase Mine and announced the re-appointment of SEMS Exploration Services to lead the next phase of its JORC Mineral Resource evaluation programme. Drilling across the northern and southern sectors has returned encouraging gold intersections, including 16 m at 1.26 g/t and 5 m at 2.76 g/t. The programme forms part of a broader strategy to build on the company's 602,000-ounce Mineral Resource, originally reported in November 2012, and progress towards an updated JORC estimate targeted for H1 2027.
Key Points
- GoldStone Resources Limited (AIM: GRL), AIM-quoted gold producer and exploration company focused on Ghana
- Pit-definition reverse circulation drilling at Homase Mine has returned significant gold intersections across northern and southern sectors, with the programme expanded to approximately 2,700 m
- SEMS Exploration Services re-appointed to manage a 32-hole, approximately 7,770 m JORC resource expansion programme across four target areas along the Homase Trend
- Investors should watch for drill results from the priority 23-hole, approximately 5,200 m programme and progress towards the targeted H1 2027 updated JORC Mineral Resource estimate
Homase Pit-Definition Drilling Identifies Gold Mineralisation Across 850 m Northern Extension
The northern component of GoldStone's reverse circulation pit-definition drilling programme, first announced on 3 August 2026, has confirmed gold mineralisation extending approximately 850 m beyond Pit 4 along the Homase Trend. Standout intersections include 26MLRC007 returning 16 m at 1.26 g/t from 11 m, and 26MLRC006 returning 5 m at 2.76 g/t from 19 m. Notably, several holes beneath trenches with historically weak surface results returned meaningful grades at depth, including 26MLRC002 at 8 m at 1.49 g/t from 25 m. The announcement states that the mineralised zone within the northern sector can extend up to 200 m in width and merits further pit modelling evaluation.
Southern Sector Drilling Extends Known Oxide Mineralisation Between Homase Pits 1 and 2
The first five holes of the southern drilling component, investigating extensions to oxide mineralisation between Pits 1 and 2, have also produced positive results. Three holes intersected 7 to 13 m of gold at grades of 0.61 to 1.02 g/t, with 26MLRC023 returning 7 m at 1.02 g/t from 50 m and 26MLRC024 returning 12 m at 0.65 g/t from 46 m. The announcement notes these results will be integrated into mine planning to assess potential additional oxide feed for the existing heap-leach operation. The southern programme is also investigating extensions towards the former Akrokeri Mine, located approximately 6 km south-south-west.
SEMS Re-Appointed to Manage 32-Hole, ~7,770 m JORC Resource Expansion at Homase
GoldStone has re-appointed SEMS, the Ghanaian geological consultancy that prepared the company's original 2012 Mineral Resource estimate, to manage the next phase of JORC resource evaluation. The full programme comprises 32 holes totalling approximately 7,770 m, including 5,300 m of RC drilling and 2,470 m of diamond drilling across four target areas: the Pits 5 and 6 northern extension, deeper mineralisation beneath Pit 4 — formerly mined by AngloGold Ashanti in 2002/03 — and extensions beneath Pits 1, 2, and 3. The existing Mineral Resource stands at 10.6 Mt at 1.77 g/t Au for 602,000 ounces, but has not been updated to reflect oxide mining undertaken since 2021.
GoldStone Targets H1 2027 for Updated JORC Estimate as Homase Trend Exploration Widens
Subject to drilling results and the necessary technical studies, GoldStone intends to progress towards an updated JORC Mineral Resource estimate targeted for H1 2027. Beyond the Phase 1 programme, the company is evaluating the broader Homase Trend structural corridor, which historical surveys suggest could be up to 1,500 m wide, as well as the approximately 6 km "Akrokeri Gap" strike-length between Homase Pit 1 and the historical Akrokeri Mine. The technical information in the announcement has been reviewed and approved by Dr Bob Foster, Non-Executive Director and Competent Person under the JORC Code (2012), who holds over 45 years of relevant experience in gold exploration.



Please wait processing your request...