Nativo Resources plc (AIM: NTVO), a precious metals company with gold mining and processing interests in Peru, has announced a focused surface sampling and geological mapping programme at its wholly owned Tesoro Gold Concession in southern Peru, with fieldwork scheduled to begin immediately and validated findings targeted for mid-December 2026. Separately, the company has confirmed the issue of 205,000,000 new ordinary shares to Axis Capital Markets Limited under its existing At the Market Facility. The dual announcement marks a significant operational step for the AIM-listed miner as it works towards restarting small-scale gold mining at Tesoro and advancing its vertically integrated business model.

Key Points

  • Nativo Resources plc (AIM: NTVO) is a Peru-focused precious metals company targeting gold mining, ore processing, and tailings recovery
  • A focused geological mapping and channel sampling programme has commenced at the Tesoro Gold Concession, targeting high-grade shoots in Zones 2 and 3
  • Field sampling is scheduled to conclude by end of November 2026, with validated findings targeted for mid-December 2026; approximately 190 samples are budgeted
  • Investors should watch for the mid-December technical findings, which will determine the next shaft location, development plan, and mining restart timetable

Tesoro Geological Programme Targets High-Grade Zones 2 and 3 to Guide Shaft Positioning

The Tesoro programme builds on a May 2026 surface campaign comprising 186 channel samples from 13 trenches across four zones. Results reported on 29 June 2026 included 10.10 g/t gold over a channel interval of 0.15 metres in Zone 2 and 10.87 g/t gold over 0.10 metres in Zone 3. The company notes that these individual results identify areas for targeted follow-up and do not establish continuity or a mineable grade. The current programme, budgeted for approximately 190 samples, will focus on vein geometry, orientation, plunge, and the structural controls on mineralisation, with an independent geological consultant providing technical oversight and quality assurance.

Mid-December 2026 Target Date Set for Technical Validation and Mining Restart Recommendations

Field sampling at Tesoro is scheduled to finish by the end of November 2026, with laboratory results expected in early December. Technical validation, interpretation, and shaft location recommendations are targeted for mid-December 2026, subject to laboratory turnaround, satisfactory data quality, and completion of the technical review. The announcement states that no additional mining permits are required for the planned restart. CEO Stephen Birrell commented that the programme represents the first step towards restarting mining at Tesoro, with ore produced expected to supply the La Patona Gold Ore Processing Plant once operational, supporting Nativo's integrated business strategy.

ATM Facility Generates £760,808.50 Net Proceeds as 205 Million New Shares Issued to Axis

Under the ATM Facility originally announced on 2 April 2026, Axis Capital Markets Limited has to date sold 299,000,000 of the 320,000,000 ordinary shares previously issued, generating net proceeds of £760,808.50 after commission and facility fees. The 205,000,000 new ordinary shares now being issued to Axis at nominal value of £0.0015 each represent approximately 10.82% of the company's enlarged issued share capital. Following admission, expected at 8:00 a.m. on or around 20 November 2026, the total issued ordinary share capital will comprise 1,894,198,741 shares, all carrying equal voting rights with none held in treasury.

Funding Availability Remains a Key Variable for Tesoro Underground Development Timeline

The announcement explicitly identifies available funding alongside geological findings, mine design, and ground conditions as factors that will determine shaft positioning and next development steps. Nativo's broader strategy centres on three activities: primary gold mining, ore processing at La Patona, and tailings recovery. The ATM Facility provides a mechanism for raising working capital, though the proceeds from the new tranche of shares will be reported in due course. Investors may be watching whether the mid-December technical findings and the funding position align sufficiently to support a defined timetable for a mining restart at Tesoro.