Power Metal Resources PLC (AIM: POW) has announced the commencement of on-site operations at its 100%-owned Tati Gold Project, located on the Tati Greenstone Belt near Francistown, Botswana. The work programme follows the approval of the Environmental Management Plan and the signing of an access agreement covering the project area, including the Cherished Hope target. Critically for shareholders, all exploration, evaluation and feasibility activities are being fully funded and managed by option partner Tuscan Holding PTY LTD, at no cost to Power Metal. Investors will be watching for drill results that will feed into a desktop feasibility study assessing small-scale mining potential at Cherished Hope.
Key Points
- Power Metal Resources PLC (AIM: POW, OTCQB: POWMF) — London-listed metals exploration company and project incubator
- On-site work has commenced at the Tati Gold Project on the Tati Greenstone Belt, Botswana, marking the start of the next phase of technical advancement
- Initial phase comprises Rotary Air Blast (RAB) drilling below the base of oxidation, followed by down-dip and along-strike drilling; results will inform a desktop feasibility study
- Investors should watch for drill results and any subsequent application to permit small-scale mining operations at Cherished Hope
RAB Drilling and Phased Work Programme Launched at Cherished Hope Target
The initial phase of on-site work at the Tati Gold Project centres on Rotary Air Blast drilling, designed to test below the base of oxidation in order to eliminate the effects of supergene enrichment on results. This will be followed by down-dip drilling to assess the geometry and continuity of the mineralised body, and subsequently by along-strike drilling to test the lateral extent of mineralisation. In parallel, high-resolution drone imagery will be collected across the project area to support environmental baseline studies, digital terrain modelling, and preliminary mining infrastructure design, the announcement states.
Tuscan Option Agreement Means Tati Advancement Costs Power Metal Nothing
Under the share option agreement signed with Tuscan Holding PTY LTD on 19 June 2024, Tuscan is responsible for fully funding and managing all exploration, evaluation and feasibility activities at Prospecting Licence PL049/2022, which forms part of the Tati Gold Project. Should Tuscan complete the feasibility study and finance construction of a processing plant and associated mine infrastructure, it may exercise its option to acquire a 75% interest in PL049/2022. Power Metal would retain a 25% interest, carried free to production, and would retain 100% ownership of all other licences within the Tati Gold Project portfolio.
Strong Gold Price Environment Cited as Key Driver for Tati's Economic Rationale
The announcement explicitly highlights what it describes as an extremely strong gold price environment as a material factor supporting advancement of the Tati Gold Project and the potential for small-scale mining at Cherished Hope. Chief Executive Officer Sean Wade stated that the favourable gold market continues to enhance Tati's potential and provides an opportunity to advance the project through Power Metal's incubation model. The company did not disclose specific gold price figures in the announcement, but the reference underscores the commodity-market context underpinning the project's economic rationale at this stage of evaluation.
Desktop Feasibility Study and Potential Mining Permit Applications to Follow Drilling
Results from the phased drilling programme will be incorporated into a desktop feasibility study assessing the potential for small-scale mining operations at Cherished Hope. The announcement states that, subject to encouraging outcomes, applications may be submitted to the relevant Botswana authorities to permit small-scale mining, with the objective of progressing toward initial gold production. Power Metal's retained 25% interest in PL049/2022, carried free to production, is intended to provide ongoing exposure to future cash flows and potential dividend distributions, though no production timeline or financial projections were disclosed in the announcement.



Please wait processing your request...