Strategic Minerals plc (AIM: SML; USOTC: SMCDF) has released the first batch of assay results from its ongoing Prefeasibility and Feasibility Study resource infill drilling programme at the Redmoor Tungsten-Tin-Copper Project in Cornwall, UK. The results confirm high-grade mineralisation within the Redmoor Sheeted Vein System, with multiple drillholes returning tungsten-equivalent grades exceeding 6.00% WO₃ Eq over one metre — described by the company as among the highest-grade tungsten intercepts reported at Redmoor to date. Separately, a previously unmodelled style of tin-copper mineralisation has been identified within the granitic body underlying the deposit, adding a new dimension to the project's geological picture that investors may be watching closely.
Key Points
- Strategic Minerals plc (AIM: SML; USOTC: SMCDF), an international mineral exploration and production company
- First results from the Redmoor infill drilling programme confirm high-grade tungsten-tin-copper continuity within the Redmoor Sheeted Vein System across drillholes CRD042, CRD043, and CRD044_D1
- Standout intercepts include 1.03m @ 5.90% WO₃, 3.68% Cu (6.54% WO₃ Eq) in CRD042, and 1.00m @ 6.00% WO₃, 1.54% Cu (6.39% WO₃ Eq) in CRD043; a previously unmodelled tin-copper zone returned 2.91m @ 0.51% Sn, 0.18% Cu from 454.00m in CRD044_D1
- Investors should watch for results from parent hole CRD044, further programme updates from three active drill rigs on site, and progress towards Prefeasibility and Feasibility Study milestones
Redmoor Sheeted Vein System Delivers Consistent High-Grade Tungsten and Copper Results Across Three Drillholes
Results reported for CRD042, CRD043, and daughter hole CRD044_D1 each successfully intersected modelled high-grade domains at broadly expected positions within the Redmoor Sheeted Vein System, reinforcing confidence in the existing geological model. In CRD042, a standout composite interval of 12.06m returned 1.15% WO₃ and 1.70% Cu from 322.72m, containing a high-grade sub-interval of 1.03m at 5.90% WO₃ and 3.68% Cu (6.54% WO₃ Eq). CRD043 returned 12.00m at 0.79% WO₃ and 0.51% Cu from 340.00m, with a best sub-interval of 1.00m at 6.00% WO₃ and 1.54% Cu (6.39% WO₃ Eq). CRD044_D1 returned 8.20m at 1.23% WO₃ and 0.77% Cu from 376.80m, including 1.02m at 6.16% WO₃ (6.34% WO₃ Eq) from 378.08m.
Previously Unmodelled Tin-Copper Mineralisation Identified Beneath the Redmoor Deposit's Eastern Extent
Drilling of CRD044_D1 extended approximately 50 metres into the granitic body underlying the Redmoor Sheeted Vein System, where multiple flat-lying aplitic bodies containing coarse-grained cassiterite and disseminated chalcopyrite were intersected for the first time. A representative interval returned 2.91m at 0.51% Sn, 0.01% WO₃, and 0.18% Cu from 454.00m, including 1.00m at 1.10% Sn and 0.37% Cu from 455.91m. The company notes this discovery does not presently demonstrate current economic mineralisation and will be subject to further geological and metallurgical testwork before any assessment of economic potential or potential inclusion in future Mineral Resource Estimate updates can be made.
Redmoor Drilling Advances Towards Prefeasibility and Feasibility Study Requirements with Three Active Rigs On Site
The company states that three drill rigs are currently active at Redmoor, with the infill programme continuing at pace. Metallurgical samples are being drilled and selected to support Phase 1 of planned metallurgical testwork, while additional samples from recently completed holes have been sent to a dedicated geotechnical laboratory in line with Prefeasibility Study and Feasibility Study requirements. Core samples are being processed at ALS Loughrae in Ireland. Assay results for parent hole CRD044 remain pending, and the company has indicated that a further programme update will follow shortly. The announcement confirms results positively reinforce the existing deposit model established in the March 2026 Mineral Resource Estimate update.
Redmoor Positioned as Europe's Highest-Grade Undeveloped Tungsten Resource, Though Comparability Caveats Apply
Executive Director Mark Burnett stated in the announcement that, based on the company's review of publicly reported Mineral Resources for CRIRSCO-compliant undeveloped tungsten projects in Europe as at March 2026, Redmoor remains the highest-grade undeveloped tungsten resource in Europe by reported average WO₃ grade of the total Mineral Resource. The company's own disclosure notes that Mineral Resource classifications, reporting cut-offs, estimation methodologies, metallurgical characteristics, and project development stages differ between projects and may affect direct comparability. The Redmoor project remains at the exploration and study stage, and investors should note that a Prefeasibility Study has not yet been completed.



Please wait processing your request...