Tertiary Minerals plc (AIM: TYM) has released preliminary results from portable X-Ray Fluorescence analysis of drill samples collected during Phase 4 drilling at its Target A1 prospect within the Mushima North Project in Zambia. The initial findings suggest the continuation of a higher-grade copper zone in the northern section of the target area, supporting the company's current Exploration Target of 15–30 million tonnes at 40–60 g/t silver equivalent. Results from 12 drill holes completed so far indicate copper and zinc intersections consistent with the company's geological model, with independent laboratory confirmation expected in the coming weeks.

Key Points

  • Tertiary Minerals plc (AIM: TYM) announced preliminary pXRF results from Phase 4 drilling at Target A1, Mushima North Project in Zambia
  • Drilling results suggest continuation of higher-grade copper and silver mineralisation in the north of the target area within near-surface oxide zones
  • Significant drill intersections include 45m at 0.41% Cu and 0.28% Zn, 55m at 0.32% Cu and 0.29% Zn, and 73m at 0.29% Cu and 0.38% Zn from separate holes
  • A total of 22 holes totalling 2,175 metres have been completed of an approximately 4,000 metre planned reverse circulation drilling programme
  • Certified laboratory analysis is underway at ALS Global in South Africa, with results expected in the coming weeks
  • The project benefits from a technical cooperation agreement with First Quantum Minerals Limited, providing access to historic exploration data and geological expertise

Mushima North Project Location and Strategic Setting

Tertiary Minerals plc holds the Mushima North Copper Project through its subsidiary Copernicus Minerals Limited, which is 90 per cent owned by Tertiary Minerals (Zambia) Limited and 10 per cent by local partner Mwashia Resources Limited. The project is located in the Iron-Oxide-Copper-Gold region of Zambia, a geologically prospective mining jurisdiction in southern Africa. Target A1 specifically lies approximately 28 kilometres to the east of the historic Kalengwa copper-silver mine, which operated in the 1970s and produced ore with exceptionally high copper grades averaging approximately 11 per cent Cu. The Kalengwa Mine is currently undergoing redevelopment and is expected to produce 15,000 tonnes of copper annually once operations resume.

The proximity of Target A1 to this historic high-grade operation provides significant geological context for Tertiary's exploration activities. The company's licence area (Licence 27068-HQ-LEL) encompasses numerous additional geochemical and geophysical targets designated A2, B1, B2, B3 and C2, the majority of which remain untested by drilling and are located within a 12 kilometre radius of Target A1. This cluster of prospective targets positions the project as a district-scale exploration opportunity within a demonstrated copper-producing region. Tertiary Minerals is an AIM-traded mineral exploration and development company with strategic focus on energy transition metals, with current principal activities centred on discovery and development of copper and precious metal resources in Nevada and Zambia.

Preliminary pXRF Analysis Results from Initial Drill Holes

The company announced preliminary results from portable X-Ray Fluorescence analysis of samples derived from the first 12 drill holes at Target A1. These initial results from the Phase 4 programme suggest the presence of a higher-grade copper zone located in the northern portion of the target area, positioned within the near-surface, lower-grade oxide mineralisation zone. The pXRF analysis, which provides semi-quantitative indication of element concentrations, detected high silver values of up to 214 g/t as well as significant copper and zinc intersections across multiple drill holes. The company emphasised that pXRF analysis for silver is semi-quantitative in nature, meaning these values are indicative only and subject to confirmation by certified laboratory analysis.

Specific drill intersections reported include 45 metres at 0.41 per cent copper and 0.28 per cent zinc from 12 metres downhole in hole 26TMNRC-045, which includes a higher-grade interval of 10 metres at 0.81 per cent copper and 0.35 per cent zinc. Hole 26TMNRC-049 returned 55 metres at 0.32 per cent copper and 0.29 per cent zinc from 26 metres downhole, including 25 metres at 0.36 per cent copper and 0.28 per cent zinc. Hole 26TMNRC-053 recorded the longest intersection of 73 metres at 0.29 per cent copper and 0.38 per cent zinc from 25 metres downhole, with a notable 20-metre interval at 0.48 per cent copper and 0.65 per cent zinc. The company noted that all reported thicknesses are downhole measurements; true widths remain unknown pending further geometric analysis.

Exploration Target Supporting Current Geological Model

The Phase 4 drilling programme is designed to support delineation of a Joint Ore Reserve Committee (JORC) Mineral Resource Estimate for Target A1. The company previously announced a JORC-compliant Exploration Target for the target of between 15 and 30 million tonnes at an average grade of between 40 and 60 grams per tonne silver equivalent. This Exploration Target defines a near-surface, tabular body located within the oxide zone approximately 500 metres long, 300 metres wide and up to 75 metres thick, based on a lower cut-off grade of 25 g/t silver equivalent. The preliminary results from Phase 4 infill drilling are reported to support the current extent of oxide mineralisation contained within this Exploration Target whilst also intersecting higher-grade copper and possible silver mineralisation in the northern section.

Richard Belcher, Managing Director of Tertiary Minerals, commented: "We are excited to report the first set of pXRF results for copper and zinc from the initial drill holes of our Phase 4 drill programme where we are currently infill drilling to support the delineation of a JORC Mineral Resource Estimate. These results suggest the higher-grade copper and silver mineralisation intersected in drill hole 25TMNRC-043 (13m at 77 g/t silver and 1.46% copper) in the last programme likely continues." He added: "This is a very exciting start to this drill programme and we eagerly await the independent external laboratory analysis for these drill holes. Drilling continues and I look forward to providing additional updates as the drill programme progresses." The company notes that mineralisation at Target A1 remains open to the northwest, southwest and at depth, meaning the full geometry of mineralisation has yet to be determined.

Phase 4 Drilling Programme Scope and Methodology

The Phase 4 reverse circulation drilling programme represents a systematic approach to defining the extent and grade distribution of mineralisation at Target A1. A total of 22 holes totalling 2,175 metres have been completed to date of an approximately 4,000 metre planned programme. Holes are planned as a series of east-west drill lines spaced approximately 100 metres apart in the north-south direction, with holes collared approximately 50 metres apart along the east-west lines and drilled to vertical depths of up to approximately 125 metres based on the estimated maximum depth capability of the drill rig being deployed. The company designed the drilling programme to be completed in two passes, allowing preliminary results to support a more dynamic drill programme approach and the updating of the geological model as new data becomes available.

Sampling from the drilling programme is being undertaken at one-metre intervals with two subsamples collected from each interval using a riffle splitter: one for potential laboratory analysis and the other for future reference. Samples are being initially analysed on site using a pXRF analyser for copper, zinc and silver. The analysis protocol includes averaging of two analyses per sample (unprepared sample analysed through a thin plastic sample bag) and inclusion of Certified Reference Material, blanks and duplicate samples as part of an internal Quality Assurance procedure. The company acknowledges that given the nature of unprepared sample and point analysis, this pXRF method is being used as a preliminary exploration technique providing an approximate quantitative measure of copper and zinc mineralisation only. pXRF results from an additional 10 holes drilled are expected imminently, with further results to be announced on an ongoing basis as the programme continues.

Independent Laboratory Analysis and Accessory Metal Investigation

Samples from selected drill holes based on initial pXRF results are being submitted to ALS Global, an independent laboratory located in South Africa, for comprehensive analysis across a range of elements. The laboratory will employ a four-acid digest analytical method (code ME-ICP61) to determine concentrations of silver, copper, zinc, bismuth, antimony and gallium. Quality assurance samples including Certified Reference Material, duplicates and blanks will be inserted and monitored as part of the laboratory's Quality Assurance Quality Control protocol to ensure data reliability and meet industry standards. The company expects certified laboratory results to become available in the coming weeks.

Beyond copper and zinc, the Phase 4 programme is investigating accessory metals associated with Target A1 mineralisation. Earlier drilling and analysis revealed elevated levels of bismuth (up to 991 g/t), antimony (up to 824 g/t) and gallium (up to 40 g/t) associated with mineralisation at the prospect. As yet, these elements have not been fully investigated for their potential economic significance or contribution to the overall value of the mineral package. The company notes that pXRF results for silver thus far are not sufficiently reliable to indicate average grades over known mineralised extents, making independent laboratory confirmation of silver values a critical component of the resource estimation process. The potential for the near-surface oxide mineralisation to transition to underlying sulphide mineralisation has also yet to be tested through the drilling programme.

First Quantum Minerals Technical Cooperation Framework

The Mushima North Project operates under a technical cooperation agreement with First Quantum Minerals Limited (FQM), a major global copper and nickel producer. Under this framework, Tertiary Minerals benefits from access to FQM's historic exploration data accumulated across the area, as well as the extensive experience and geological understanding of FQM's technical team regarding the area's mineralisation systems and structural controls. The agreement is expressly non-binding and does not create any obligation to enter into any further agreement between the parties. Importantly, there are no commercial restrictions imposed on Tertiary arising from this arrangement, and FQM does not hold a right of first refusal over the project.

This collaborative framework allows Tertiary Minerals to leverage FQM's accumulated knowledge base without surrendering commercial flexibility or exploration independence. The technical cooperation agreement was originally established in September 2022, providing Tertiary with a foundation of geological understanding to guide its exploration activities at Mushima North. The arrangement represents a pragmatic approach to project advancement where a junior exploration company gains access to institutional knowledge and data from an experienced major producer operating in the same metallurgical district. The non-binding nature of the agreement means both parties retain flexibility in their respective strategic objectives and commercial arrangements.

Competitive Advantages of Target A1 Within Polymetallic Context

Target A1 is defined as a polymetallic prospect encompassing silver, copper and zinc mineralisation within a near-surface oxide zone. This polymetallic character provides multiple revenue streams and potential investment appeal in an environment where energy transition demand supports copper markets whilst precious metals retain investment value. The silver content of the mineralisation—with Exploration Target grades of 40–60 g/t silver equivalent—represents a significant component of the overall mineral endowment. Previous drilling at Target A1 identified exceptional silver grades, with hole 25TMNRC-043 returning 13 metres at 77 g/t silver and 1.46 per cent copper, demonstrating that higher-grade silver zones do exist within the prospect area.

The presence of elevated levels of accessory metals including bismuth, antimony and gallium adds further complexity and potential value. These elements are increasingly sought for technology applications including semiconductors, solar photovoltaic systems and other advanced materials critical to energy transition and electronics manufacturing. The near-surface nature of the oxide mineralisation offers potential advantages in terms of mining costs and environmental considerations compared to deeper sulphide deposits. The geometry of the target—a tabular body approximately 500 metres long, 300 metres wide and up to 75 metres thick—suggests a deposit architecture that may be amenable to open-pit mining methods if economic viability is established.

Geological and Jurisdictional Risk Factors Specific to Zambia Operations

While Zambia is recognised as a stable and democratic mining jurisdiction with established mining infrastructure and regulatory frameworks, all mineral exploration activities carry inherent geological and commodity-price related risks. The Mushima North Project operates within the iron-oxide-copper-gold mineralisation system of northwestern Zambia, a belt with demonstrated copper endowment but where exploration success is not assured. The company's ability to convert the current Exploration Target into a reportable Mineral Resource and subsequently into an economic mining reserve depends on continuation of favourable drilling results, successful completion of detailed geological modelling, and demonstration of economic viability at projected commodity prices.

Exploration risk extends beyond geology. Commodity price volatility for copper and silver directly impacts project economics and investment attractiveness. The Phase 4 drilling programme remains early stage, with only 22 of approximately 4,000 metres of planned drilling completed. Whilst preliminary pXRF results are encouraging, independent laboratory confirmation is still pending. The company also carries jurisdictional risks common to Africa-based mining exploration, including regulatory changes, social licence considerations and potential variability in permitting timelines. The announcement notes that the technical cooperation agreement with FQM, while beneficial for knowledge access, does not confer any commercial security or operational advantage beyond data sharing and geological consultation.

Strategic Positioning Within Energy Transition Metals Focus

Tertiary Minerals positions itself strategically as a mineral exploration company focused on energy transition metals, with Mushima North representing a key copper asset within this portfolio. Copper demand is forecast to grow substantially over coming decades as a result of renewable energy infrastructure buildout, electric vehicle adoption and grid modernisation initiatives globally. Zambia, as a historically significant copper producer with established mining culture and export infrastructure, represents a jurisdictionally attractive location for copper exploration and development within this secular demand trend. The company's Nevada operations provide geographic diversification whilst maintaining focus on copper and precious metals critical to energy transition applications.

The Phase 4 drilling programme at Mushima North aligns with Tertiary's strategic objective of advancing copper and precious metal discoveries in prospective, mining-friendly jurisdictions. The near-surface nature of Target A1 mineralisation and its silver-copper-zinc polymetallic character position it as a potential near-term development opportunity relative to deeper or more complex deposits. If the JORC Mineral Resource Estimate is successfully defined and demonstrates economic viability, Mushima North could transition from pure exploration asset toward a development-stage project, potentially unlocking value for shareholders through alternative financing structures, strategic partnerships or other value realisation mechanisms. The company's current focus on resource definition through systematic infill drilling reflects a professional approach to building sufficient data confidence to support resource estimation and subsequent pre-feasibility assessment.

This article is for information purposes only and should not be construed as investment advice. The information contained herein is based solely on public announcements made by Tertiary Minerals plc and third-party sources deemed reliable, but is not guaranteed to be accurate or complete. Prospective investors should note that mineral exploration is speculative in nature; Exploration Targets are conceptual in nature and may not be realised. Readers should seek independent financial, geological and legal advice before making any investment decisions regarding Tertiary Minerals plc or any other securities.