Highlights
• Net Zero Infrastructure shareholders pass all resolutions at the general meeting held on 17 November 2026.
• A 5-for-1 consolidation and subdivision turns 102,150,000 existing shares into 20,430,000 new ordinary shares plus deferred shares.
• Admission of the new ordinary shares is now proposed for 8.00am on 19 November 2026.
• New articles require the company to complete an initial transaction by 29 July 2027.
The sequence ran in a tight line. Proxy votes closed at 11.00am on 13 November 2026, the general meeting followed at 11.00am on 17 November, and admission of the new shares is now scheduled for 8.00am on 19 November. Across two announcements, Net Zero Infrastructure (LSE:NZI) has confirmed the meeting result, set out the mechanics of its Share Capital reorganisation and updated the timetable by one trading day.
The general meeting result
All resolutions put to shareholders at the general meeting were passed. The announcement of the result does not include vote counts.
With the resolutions approved, Net Zero Infrastructure (LSE:NZI) can proceed with its share capital reorganisation and the adoption of new articles of association.
How the reorganisation works
The reorganisation combines a 5-for-1 consolidation with a subdivision. The 102,150,000 existing shares become 20,430,000 new ordinary shares and 10,194,570,000 deferred shares.
A calculation based on the disclosed figures shows that this equates to one new ordinary share and 499 deferred shares for every five existing shares. Fractional entitlements arising from the consolidation will be sold, and proceeds of less than £5 will be retained by Net Zero Infrastructure (LSE:NZI).
A one-trading-day change to the timetable
The proposed reorganisation was delayed by one trading day because of a global IT outage. Admission of the new ordinary shares is now proposed for 8.00am on 19 November 2026, rather than 18 November as previously planned.
New ordinary shares held in uncertificated form are due to be credited to CREST accounts on 19 November 2026. Share certificates for holders of certificated shares are expected to be dispatched by 1 December 2026.
New articles and the path ahead
The new articles adopted at the meeting set a clear milestone: the company is to complete an initial transaction by 29 July 2027. That date gives the Business a defined window in which to complete a qualifying deal.
The company's shares remain suspended pending its proposed reverse takeover. The reorganisation and the new articles therefore form part of the groundwork ahead of that transaction. The 29 July 2027 date and the proposed reverse Takeover now sit side by side as the two reference points for the company's next stage.
Understanding the Share Reorganisation
A share consolidation combines a number of existing shares into fewer shares, and a subdivision splits shares into smaller units. Net Zero Infrastructure's reorganisation does both: 102,150,000 existing shares become 20,430,000 new ordinary shares and 10,194,570,000 deferred shares. That equates to one new ordinary share and 499 deferred shares for every five existing shares, a calculation based on the disclosed figures. Deferred shares are a class of shares that carry very limited rights and are typically created in a reorganisation of this type, so the new ordinary shares are the main class going forward.
Timetable and Settlement
The timetable moved by one trading day because of a global IT outage, so admission of the new ordinary shares is proposed for 8.00am on 19 November 2026 rather than 18 November. Shares held in uncertificated form will be credited to CREST accounts on 19 November, and certificates for holders of certificated shares are expected to be dispatched by 1 December 2026. CREST is the electronic system used to settle share transactions in the UK. Fractional entitlements arising from the consolidation will be sold, and proceeds of less than £5 will be retained by the company. The announcement of the result does not include vote counts, though all resolutions were passed. Readers following the company can therefore treat the timetable as the main set of dates, with 19 November for admission and 1 December for certificates. The company's shares remain suspended pending its proposed reverse takeover, which is a transaction in which a company acquires a larger business and issues shares in exchange.






Please wait processing your request...