Shuka Minerals plc (LSE:SKA), the exploration company advancing the historic Kabwe zinc-lead mine in Zambia, has continued to attract attention as an intensive drilling campaign delivers a steady stream of high-grade assay results. The company's shares have moved higher in recent sessions as investors track a run of drill updates from Kabwe alongside fresh Equity funding to keep the exploration programme going. With a Market Capitalisation of under £4 million, Shuka remains a small and speculative stock, but the sheer frequency and quality of its recent drilling results has made it one of the more closely watched names among AIM's junior miners this summer.
A rapid-fire drilling campaign at Kabwe
Since June 2026, Shuka has released a near-continuous run of drilling updates from its Kabwe project, numbered sequentially from KBDD02 through to KBDD11 by late August. The most recent result, announced 26 August 2026, covered a hole drilled south of the mine's 'Speaks' and 'Mine Club' zones to a depth of 155.3 metres. It returned an upper zone of 18.4 metres grading 7.45% zinc, including a peak reading of 18.9% zinc, and a lower zone of 27.1 metres at 19.60% zinc with a maximum grade of 69.6% zinc, alongside a basal lead-rich section and elevated vanadium readings of up to 2.7%.
Chief Executive Richard Lloyd said the roughly 70% zinc in-situ grades recorded were among the highest reported at any orebody worldwide, describing the intercept as an extension of the previously mined OreBody #1 that could support early-stage exploitation. The company has cautioned that these portable XRF-based readings remain pending laboratory verification, a standard caveat for field assay results in early-stage drilling programmes.
Funding the exploration push
The drilling campaign has been underpinned by a series of fundraisings through the summer. On 3 September 2026, Shuka confirmed receipt of the second and final Tranche of a £750,000 subscription, worth £375,000, alongside warrants issued to Menel Energy and Resources Limited over up to 18,750,000 new shares at 8 pence each, exercisable until July 2029. Following admission of the associated shares, total issued Share Capital was set to reach just over 173 million ordinary shares.
The company has also been managing its Balance Sheet through Loan assignments and conversions, including the assignment of £400,000 and £800,000 tranches of a GMI loan to investors including RAB Capital, and the conversion of loan balances into equity — moves that reduce Debt but add to the company's share count.
A high-grade story still at an early stage
Shuka's final results for the year, published 30 June 2026, and its subsequent run of drilling news, reflect a company in aggressive exploration mode at Kabwe, a historic Mining district in Zambia with a long production history that Shuka is now seeking to redevelop. While the zinc and vanadium grades disclosed so far have been notably high, the company remains pre-revenue on the project and reliant on regular equity and debt funding to sustain its drilling programme, underlining the speculative nature of the stock even as newsflow has been broadly positive.
What investors may watch next
Investors will want to see laboratory-confirmed assay results follow the portable XRF readings reported across the KBDD drill series, which would provide independent verification of the very high grades disclosed so far.
Beyond further drilling results, progress toward a resource estimate or scoping study at Kabwe, along with how the company manages ongoing dilution from its subscription and loan-conversion activity, will be important in assessing whether the recent share-price momentum can be sustained.



_11_26_2026_08_28_26_154316.jpg)


Please wait processing your request...