AltynGold Plc (LSE:ALTN) reported record revenue, EBITDA and profit for the first half of 2026, helped by a 50% rise in its realised gold price and higher throughput at its Sekisovskoye mine in Kazakhstan. The company says it remains on track for full-year production guidance of 52,000-55,000 ounces.
What was announced
AltynGold Plc (LSE:ALTN) published its half-year report for the six months to 30 June 2026, describing the period as its record half-year. Chief executive Aidar Assaubayev said: "AltynGold delivered record revenue, EBITDA and profit in the first half of 2026". The company operates the Sekisovskoye gold mine in Kazakhstan. No Dividend is mentioned in the announcement.
The numbers
Revenue rose 64.6% to US$115.2m from US$70.0m in the first half of 2025. Adjusted EBITDA increased 55.4% to US$68.5m from US$44.1m, and profit after tax rose 58.4% to US$42.7m from US$27.0m. Earnings Per Share were 156.38 US cents against 98.71 cents. Based on the disclosed figures, the adjusted EBITDA Margin was about 59%.
The main driver was price. AltynGold sold 24,628 ounces, up 9.0%, at an average realised price of US$4,615 per ounce, up 50.3%. It poured 23,906 ounces.
Other operating measures were mixed:
- Ore processed rose 10.1% to 498,331 tonnes
- Average mined grade fell 10.4% to 1.81g/t, and processed grade fell 13.7% to 1.76g/t
- Gold recovery was 84.55%, down 0.20 percentage points
- All-in sustaining cost (AISC) was US$1,995 per ounce, compared with US$1,530 for the full 2025 financial year, a rise of about 30%
Based on the disclosed figures, the gap between the realised price and AISC was about US$2,620 per ounce. The company reported no lost-time injuries.
Cash generated from operations increased 64.7% to US$52.1m. Capital Expenditure was US$26.1m, compared with US$11.7m a year earlier; US$20.1m of this was non-sustaining, growth-oriented spending. Based on the disclosed figures, Operating Cash Flow covered total capital expenditure about twice over. The company repaid US$9.8m of debt, cutting total borrowings by 23.8% to US$31.4m.
At 30 June, AltynGold held cash of US$12.1m and net Debt of US$19.3m. Net debt to EBITDA was about 0.15x, compared with 0.18x at the end of 2025. Net Assets rose 35.3% to US$203.1m.
Operations and projects
Grades improved during the half. The company says bridging work, completed in April 2026, dealt with a temporary vertical gap between the main ore bodies. Mined grade rose from 1.73g/t in the first quarter to 1.88g/t in the second. The processing plant runs at a capacity of 1Mtpa.
On expansion, technical work has identified potential to raise the capacity of the existing plant by roughly 200,000 tonnes a year, and new crushing and milling equipment has been ordered. The company is also reviewing a wider expansion to 2.0-2.5Mtpa and expects to give an update by the end of 2026. It states that no Investment decision has yet been made.
At Teren-Sai, an application to move to the production stage is progressing, with a resource estimate pending. AltynGold says it expects to update shareholders in the fourth quarter of 2026.
What to watch next
The company says: "The Company remains on track to meet its full-year production guidance of 52-55Koz." Based on the disclosed figures, reaching that range would require around 28,000-31,000 ounces in the second half, based on the 23,906 ounces poured in the first half. This is arithmetic on the company's own guidance, not a forecast.
Other items to watch are whether grades stay at the second-quarter level, the direction of AISC, the year-end update on the 2.0-2.5Mtpa expansion, and the fourth-quarter update on Teren-Sai. Realised prices depend on the gold market. The first half's result reflected the average price the company achieved during those six months.



_11_26_2026_13_50_36_663169.jpg)