Key Highlights

  • Q1 FY2027 contained tin production rose 20% year-on-year to 286 tonnes, with tin concentrate output up 16% to 473 tonnes.
  • FY2025 Revenue rose 33% to £23.8 million, with EBITDA turning positive at £0.5 million from a £4.8 million loss.
  • Ore-sorting test work at Brandberg West showed over 90% waste rejection and grade uplifts of up to 7x for tin.
  • Lithium Ridge drilling under an SQM earn-in returned intersections up to 3.46% lithium oxide near surface.
  • The company secured conditional approval for a N$98 million ten-year Loan to fund an ore-sorting circuit at Uis.

The Namibia-focused miner has now delivered several consecutive record quarters at its Uis tin operation, while early ore-sorting test work at its historic Brandberg West tungsten project points to a potentially lower-cost route into a second revenue stream, alongside promising lithium drilling results.

Andrada Mining (LSE:ATM), the LSE-listed producer that mines tin at its Uis operation in Namibia, has spent the past year building a track record of sequential production records rather than a single headline breakthrough. Its latest Business update, covering the quarter ended 31 May 2026, reported record contained tin output and record tin concentrate production, alongside encouraging early test results from its Brandberg West tungsten-tin-copper project. Together with progress at Lithium Ridge, the update reinforces a strategy of turning a single-commodity tin miner into a broader critical-minerals producer.

What Happened

In the business update published on 29 June 2026, Andrada reported quarterly contained tin production of 286 tonnes, up 20% year-on-year, and tin concentrate output of 473 tonnes, up 16%. Ore processed rose 6% to 270,069 tonnes, with plant throughput increasing to 154 tonnes an hour from 142 tonnes previously. Chief executive Anthony Viljoen described the quarter as one of the company's strongest, citing record tin production, progress at Lithium Ridge and "encouraging" ore-sorting results at Brandberg West. Andrada also secured conditional approval for a N$98 million (roughly £4.4 million) ten-year loan Facility from Bank Windhoek and the Development Bank of Namibia to fund an ore-sorting circuit at Uis.

Why It Matters

The result extends a run of quarterly production records stretching back through the 2026 financial year, when full-year tin concentrate output rose 15% to 1,740 tonnes and Andrada generated positive free Cash Flow for the first time. Viljoen described that year as "transformational" for the business as a whole. This matters because Andrada has historically been loss-making, and consistent throughput gains at Uis are the foundation on which it is trying to fund its tungsten and lithium ambitions without relying solely on Equity markets.

Latest Financial and Operational Performance

Andrada's most recent audited annual results, for the year ended 28 February 2025, showed revenue of £23.8 million, up 33% on £18.0 million, as the average realised tin price rose 21% to $31,081 a tonne. Gross Profit increased 72% to £3.0 million and EBITDA turned positive at £0.5 million, against a £4.8 million loss previously, while the operating loss narrowed by more than half to £3.9 million. Contained tin production was 921 tonnes, up 4.1%, with recovery rates improving to 72% from 69% and tantalum output rising sevenfold to 50.6 tonnes. The following year, ended 28 February 2026, brought further momentum, with full-year tin concentrate production up 15% and an extended offtake relationship with tin trader Thaisarco. Quarterly updates since have shown output continuing to climb.

Key Numbers

  • Q1 FY2027 (quarter to 31 May 2026): contained tin 286 tonnes (+20% year-on-year); tin concentrate 473 tonnes (+16%)
  • FY2026 (year to 28 February 2026): full-year tin concentrate production 1,740 tonnes, up 15%
  • FY2025 (year to 28 February 2025) audited results: revenue £23.8 million (+33%); EBITDA £0.5 million positive (from a £4.8 million loss); operating loss £3.9 million
  • Average realised tin price in FY2025: $31,081 per tonne (+21%); quarterly tin price range in Q1 FY2027: $41,600—$57,000 per tonne
  • Brandberg West ore-sorting test work: over 90% waste rejection, with grade uplifts of up to 7x for tin, 6x for tungsten and 4x for copper
  • Market Capitalisation approximately £87 million, with shares trading around 3.95p, against a 52-week range of 2.65p to 4.79p

Growth Opportunities

Andrada's growth case rests on two projects beyond Uis. At Brandberg West, a historic tungsten-tin mine, an affiliate of ACAM can earn up to a 49% interest for phased funding of up to $51 million, of which an initial $10 million Tranche has been drawn for early drilling and metallurgical work. Ore-sorting test results suggest a lower-capital route, rejecting waste early and lifting tin, tungsten and copper grades, with tin and tungsten recoveries reported above 80%. At Lithium Ridge, a 16,500-metre, 143-hole drilling programme has been completed under an earn-in with chemicals group SQM, with early assays showing lithium intersections up to 3.46% lithium oxide near surface, alongside associated tin and tantalum; full assay results are due through the third quarter of the 2027 financial year. The EIB is separately funding a feasibility study on integrating lithium processing at Uis itself.

Risks Investors Should Know

Andrada remains a small-cap, single-mine producer whose Earnings are geared to the tin price; a Reversal would pressure margins quickly given its recent history of losses. Brandberg West and Lithium Ridge are both pre-development projects: metallurgical test work and drill intersections are encouraging but do not guarantee an economic, financeable mine, and the ACAM arrangement will dilute Andrada's ultimate interest in Brandberg West to a minority stake if fully earned in. The company relies on a patchwork of funding, including Debt from Bank Windhoek and the Development Bank of Namibia, EIB support, and equity raises such as the post-period Talent10 placing, which brings refinancing and dilution risk if any single source falls away. Namibia is relatively stable by regional standards, but investors should still weigh country and currency risk, and AIM shares of this size can be thinly traded and volatile, as reflected in a 52-week range of roughly 2.65p to 4.79p.

What to Watch Next

The near-term catalysts are operational rather than exploratory: the full Lithium Ridge assay set, due through the third quarter of FY2027; further Brandberg West metallurgical results that could support a development decision; and progress drawing down the Bank Windhoek and Development Bank of Namibia facility. Investors will also want to see whether Andrada sustains its run of quarterly records and whether rising output keeps translating into free cash flow rather than being absorbed by growth spending.

Outlook

Andrada's recent updates show a company executing consistently at its core Uis tin operation while methodically de-risking two additional growth projects through partner funding rather than heavy equity dilution. The record quarterly tin figures are verifiable, and the tungsten and lithium results are genuinely promising early-stage work rather than confirmed reserves. Whether Brandberg West and Lithium Ridge become the Assets management believes they can be will depend on results still to come, and on Andrada's ability to keep financing growth without straining its Balance Sheet .