Kendrick Resources (LSE:KEN) has reported preliminary portable XRF results from drilling at its Teufelskuppe rare earth project, including 5.08% light rare earth oxides over 20 metres and 2.81% over 78 metres. Certified laboratory assays are still pending.

What was announced

On 29 September 2026 Kendrick Resources Plc (LSE:KEN) released new drill results from Teufelskuppe, a carbonatite complex in which drilling is targeting a series of sills and dykes designated TK1 to TK7. The company said mineralisation is hosted by fluorcarbonate minerals, including synchysite and parisite, carrying light rare earth oxides (LREO).

All of the results are portable X-ray fluorescence (pXRF) readings, which are preliminary. Certified laboratory assays are under way and will replace the pXRF figures in any final JORC resource statement. The company said the reliability of its pXRF data was supported by an earlier comparison with certified laboratory results on the same core, announced on 2 September 2026.

The release reports aggregate LREO only. No breakdown for individual elements, such as neodymium and praseodymium, is given, so the magnet rare earth content of the intercepts cannot be assessed from this release.

The numbers

The company highlighted the following continuous intercepts:

  • 5.08% LREO over 20m from 70m (TKRC009)
  • 4.85% LREO over 23m from 56m (TKRC020)
  • 4.30% LREO over 15m from 30m (TKRC009)
  • 3.37% LREO over 40m from 10m (TKRC014)
  • 3.36% LREO over 48m from 31m (TKRC008)
  • 3.27% LREO over 46m from 21m (TKRC007)

Its highest-grade narrower intervals included 6.98% LREO over 6.0m (TKRC009), 5.90% over 7.0m (TKRC016) and 5.84% over 8.0m (TKRC018).

Among wider zones above 2% LREO, the company reported 2.81% over 78m from 20m in TKRC020, 2.87% over 28m in TKRC017, 2.55% over 43m in TKRC013 and 2.20% over 48.75m from 2.25m in diamond hole TKDD030.

Several of the highlighted figures are sub-intervals of longer intercepts in the same hole. For example, the 5.08% over 20m in TKRC009 sits within a reported 4.28% over 26m from 66m to 92m, and the 4.85% over 23m in TKRC020 sits within its 2.81% over 78m.

There is also a minor inconsistency in the release for hole TKRC011, which is shown as 2.84% over 32m in the highlights and 2.85% over 33m (3m to 36m) in the table.

The drilling programme

The company said 90 holes have been completed to date: 38 diamond holes and 52 reverse circulation (RC) holes. The results in this release cover diamond holes TKDD019 to TKDD030 and RC holes TKRC001 to TKRC020, a subset of that total. Infill diamond drilling is continuing with two rigs.

Chairman Colin Bird, who is also the Competent Person and is described as a chartered engineer with more than 40 years' hard rock Mining experience, said: "The consistency of grade combined with excellent continuity of mineralisation over substantial widths remain the defining features of the Teufelskuppe deposit." He added that coverage is expanding over the multiple sills and dykes.

The announcement does not state Kendrick's ownership interest in Teufelskuppe or the project's location. It refers separately to the company's Bonya Rare Earth Project in Namibia and the Blue Fox Licence in north-west Zambia.

What to watch next

Kendrick is developing an in-house volumetric mineral resource model using the pXRF data and geological modelling, under a development plan published on 6 May 2026. The company intends to convert this into a JORC (2012) compliant estimate once certified laboratory assays are received.

The key next items are the laboratory assay results, which will show whether they confirm the pXRF readings, and any element-level breakdown of the rare earth content. No timetable for the assays or the resource estimate is given in the announcement.