Orosur Mining has reported that its first drill hole at the El Cedro prospect in Colombia intersected 267.4 metres at 0.65 grams per tonne gold from surface. The hole ended in mineralisation after rig problems stopped it short of its 500-metre target.

What was announced

In an exploration update published on 14 October 2026, Orosur Mining (LSE:OMI) released the first assay results from El Cedro. The prospect is a cluster of gold and copper porphyry targets about four kilometres south of the APTA base camp, within the company's Anzá project in Colombia. Drilling at El Cedro began on 26 August 2026. The company flagged the announcement as containing inside information under the UK Market Abuse Regulation.

The maiden hole, CED001, was drilled at a dip of -55 degrees and an azimuth of 180 degrees. It returned 267.4 metres at 0.65 g/t gold from surface. The hole ended in mineralisation, meaning the mineralised zone is open at depth.

Chief Executive Officer Brad George said the results provide "evidence of a mineral system of substantial scale".

The numbers

Within the overall intercept, Orosur reported several higher-grade sections:

  • 46.3 metres at 1.00 g/t gold from 19.2 metres
  • 28.25 metres at 1.01 g/t gold from 118.75 metres
  • 22.2 metres at 1.01 g/t gold from 225.2 metres, including 2.15 metres at 3.89 g/t gold

The results use a cut-off grade of 0.3 g/t gold over three metres. All intervals are downhole lengths, and the company said true widths are not yet known. So far, only fire assay results for gold are available.

Based on the reported figures, the three higher-grade sections together cover about 96.75 metres. That is a little over a third of the full 267.4-metre intercept.

Context and caveats

CED001 was planned to reach 500 metres but was stopped at 267 metres because of problems with the drill rig. Orosur said a new hole, CED001A, has been positioned alongside it, with the plan of reaching the 500-metre target depth. Results from a single hole cannot show how far the mineralisation extends sideways or downwards. CED001A is designed to test the deeper part of the system. Because CED001 finished in mineralisation, the depth to which gold continues below 267 metres has not yet been tested, and the company has not said when results from the new hole are expected.

Multi-element (ICP-MS) assays are expected "in the coming weeks", according to the company. These should provide information on copper and other elements, which matters for a target described as a gold and copper porphyry cluster. The company said the style of mineralisation at El Cedro differs from that at its Pepas and APTA prospects, and that its understanding of what controls the mineralisation is still preliminary.

These are early-stage exploration results. The announcement does not include a mineral resource estimate for El Cedro, and long intercepts at around 0.65 g/t gold do not on their own show that a deposit could be mined economically.

Pepas permitting

Orosur (LSE:OMI) also gave an update on its Pepas prospect, also within the Anzá project. It said it had completed a final draft of the Plan of Works, known as the PTO, a key permitting document in Colombia. Consultation with Colombia's National Mining Agency (ANM) is about to begin. The announcement does not give a timetable for approval.

What to watch next

The next milestones are the multi-element assay results from CED001, progress and results from CED001A as it aims for 500 metres, and any further holes that test the wider El Cedro porphyry cluster. At Pepas, the outcome and timing of the consultation with the ANM on the Plan of Works will be the main point to watch.