Orosur Mining Inc. (LSE:OMI) used its audited results for the year to 31 May 2026 to highlight a maiden 219,000-ounce gold resource at Pepas in Colombia, full ownership of the El Pantano project in Argentina and a brokered Placement of up to C$14m due to close on 6 October.

What was announced

Orosur Mining (LSE:OMI), a minerals explorer quoted on the TSX Venture Exchange and AIM, published its full-year results on 28 September 2026. The company's activities are split between the Anza project in Colombia and the El Pantano project in Santa Cruz province, Argentina.

At Anza, Orosur said it had completed the in-fill drilling programme at the Pepas discovery and "has declared a Maiden Resource Estimate of 219,000 ounces of gold." The results announcement does not set out the tonnage, grade, resource category or cut-off grade behind that figure. After the year end, the company identified a second mineralised area about 100 metres west of Pepas.

The numbers

Orosur reported a net loss of $5.95m for the year, compared with Net Income of $9.94m in the prior year. The announcement does not break down the origin of the prior-year income. Exploration and evaluation spending was $6.07m.

Cash at 31 May 2026 was $9.95m, up from $4.88m a year earlier, helped by an upsized brokered placement in October 2025 that raised C$20m through the issue of 58,823,530 shares at C$0.34, closing on 2 October 2025. The company said cash stood at about $7.35m at the date of the announcement. The weighted average number of shares in issue for the year was 367,463,275.

After the period end, on 22 September 2026, Orosur announced a brokered private placement to raise gross proceeds of up to C$14m through the issue of 43,750,000 units at C$0.32 each. According to the announcement, each Warrant can be exercised for one common share at "US$0.32 for a period of 2 years from the date of issuance save for the first 61 days post issuance". The quoted exercise price appears in US dollars even though the units are priced in Canadian dollars; the reason for this is not explained. Closing is expected on 6 October 2026. The announcement does not specify the use of proceeds.

The financial statements have been prepared on a Going Concern basis.

Drilling and ownership

Beyond Pepas, drilling at the APTA area began after the year end and has identified three areas of potential that require follow-up. At El Cedro, partial results include 61.35m at 0.93g/t gold from surface, including 42.15m at 1.02g/t from 19m. Drilling there started in late August 2026 and is planned to reach a depth of 500 metres.

In Argentina, the first drilling programme at El Pantano was completed by March 2026, comprising about 5,500 metres in 24 diamond holes. On 22 July 2026 Orosur announced what it described as a major gold and silver epithermal system at the project. The company has exercised its option to take 100% ownership of El Pantano, with the vendor, Deseado, retaining a 2% net smelter return royalty, half of which can be bought back for $1m.

Louis Castro is Chairman and Brad George is Chief Executive and the qualified person for the technical disclosure. The announcement contains no attributed quotes from either.

What to watch next

Near-term items include the closing of the C$14m placement on 6 October, follow-up drilling at APTA and the area west of Pepas, and further results from the deeper El Cedro programme. For El Pantano, the company said interpretation of the drilling data will inform the "next phase of field work which may be commissioned later in the year", potentially ahead of a second drill programme. Investors may also look for fuller technical detail on the Pepas resource, which the results announcement does not provide.