Rockfire Resources plc (LSE:ROCK) reported a loss of £1.29m for the first half of 2026 as drilling stepped up at its Molaoi zinc-germanium-silver-lead project in Greece, where hole HMO-015 returned 11.90m at 8.8% zinc.
What was announced
Rockfire Resources (LSE:ROCK) published unaudited interim results for the six months to 30 June 2026 on 28 September 2026. The company said the higher loss reflected drilling and project development at Molaoi, where diamond drilling to upgrade the Inferred JORC resource to the Indicated category resumed on 13 January 2026 and is planned to continue through the end of 2026. The company said it is "actively pursuing development" of Molaoi while managing expenditure through a phased exploration approach.
The numbers
Administrative expenses rose to £1,289,762 from £536,087 in the first half of 2025, and the loss for the period was £1,289,566 (H1 2025: £536,087). The total comprehensive loss was £1,126,157 (£627,224). Basic and diluted loss per share was 0.01p. Exploration expenditure increased to £860,840 from £195,632, and the operating cash outflow was £1,215,861.
Cash stood at £1,829,762 at 30 June 2026, compared with £1,057,236 at 31 December 2025 and £140,079 at 30 June 2025. Total Assets were £9,711,253, of which intangible assets, mainly exploration rights, accounted for £7,387,309. Current liabilities were £635,515 and net assets £9,075,738. During the half, 131,250,000 warrants were exercised, raising £131,250.
Molaoi drilling and studies
The key drill results reported in the half were:
- HMO-015: 11.90m at 8.8% zinc, 49.0g/t silver and 25.2g/t germanium
- HMO-016: 0.76m at 22.4% zinc, 187g/t silver, 8.8% lead and 34.6g/t germanium
- HMO-010: 1.2m at 5.5% zinc and 18g/t silver, with a separate 0.30m interval at 54g/t germanium
Of the three intervals listed, HMO-015 is the widest, at more than 15 times the length of the HMO-016 intercept on a simple calculation. Rockfire has acquired its own drilling rig to address a shortage of rigs in Europe and challenging ground conditions. An engineering assessment in June 2026 concluded that historical underground mine workings at Molaoi can be reused.
Long lead-time ecological and hydrology studies and comminution testing have begun, and the company has scheduled a pre-feasibility study for the second quarter of 2027. Chief Executive David Price, a Fellow of the AusIMM, acts as the qualified person for the technical information.
In Queensland, Australia, the Lighthouse project is subject to a joint venture under which Sunshine Metals can earn 75% by funding exploration; its Plateau deposit holds an Inferred Resource of 49,000oz of gold at 2.0g/t. At Marengo, Eastern Resources has a three-year sole-funding farm-in, and rock sampling in July 2026 confirmed shallow gold-silver mineralisation.
Funding, Options and what to watch next
On 10 August 2026, after the period end, Rockfire raised £2.15m before expenses through a subscription for 1,954,545,446 new shares at 0.11p each. Broker Temeraire Partners received 78,181,818 warrants, equal to 4% of the subscription, exercisable at 0.11p for 36 months.
On 26 August 2026, the company granted 400,000,000 options to ten directors and senior managers at an exercise price of 0.23p, expiring on 24 August 2029. Chief Executive David Price received 70,000,000 of these options. These are option awards, not share purchases.
On a calculation combining period-end cash with the gross August subscription, and before costs and spending since 30 June, the company had access to roughly £3.98m. This is an illustrative figure, not a disclosed cash balance.
Items to watch include further Molaoi assay results, deployment of the company-owned rig, progress on the resource upgrade and the environmental and metallurgical studies, and delivery of the pre-feasibility study in the second quarter of 2027, as currently scheduled by the company.
_11_25_2026_14_04_26_167429.jpg)





Please wait processing your request...