Mila Resources has reported high-grade gold intercepts and mineralisation at depth from drilling at its Yarrol project in Queensland, with more assays pending ahead of a maiden resource estimate targeted for Q4 2026.

Mila Resources Plc (LSE:MILA), the Main Market-listed gold and copper explorer focused on Australia, announced on 12 October 2026 assay results from four of the nine holes in its latest reverse circulation (RC) drilling programme at Yarrol North, part of its 100%-owned Yarrol Gold Project in Queensland. The standout result was 2 m @ 11.85 g/t Au from 156 m in hole MYARC0225, including 1 m @ 23.40 g/t Au from 156 m. Another hole, MYARC0224, returned a broad interval of 43 m @ 1.06 g/t Au from 45 m.

What the results could mean is set out in the company's own framing: Mila says the programme supports continuity of mineralisation at depth, which feeds directly into its plan to publish an initial Mineral Resource Estimate (MRE) at Yarrol, targeted for Q4 2026. Assays for the remaining five holes are expected "over the coming weeks". There has been no new announcement since 12 October, and on 15 October the shares were unchanged at 1.125p on volume of 2,970,679. Mila is one of the stocks drawing heavy discussion among UK investors today.

The 12 October drilling results in detail

The nine-hole RC programme at Yarrol North included holes ranging from 101 m to 198 m in depth. The reported intercepts so far are:

  • MYARC0224: 43 m @ 1.06 g/t Au from 45 m, including 17 m @ 1.51 g/t Au from 71 m, which itself includes 2 m @ 5.92 g/t Au from 81 m. The hole also returned 2 m @ 2.35 g/t Au from 166 m, extending mineralisation to approximately 170 m vertical depth.
  • MYARC0225: 2 m @ 11.85 g/t Au from 156 m, including 1 m @ 23.40 g/t Au from 156 m.
  • MYARC0227: 7 m @ 1.11 g/t Au from 57 m.
  • MYARC0223: 3 m @ 2.34 g/t Au from 14 m.

The results are reported using a 0.3 g/t Au cut-off. Importantly, they are downhole widths, and true widths have not been estimated. Assays were carried out by ALS Brisbane, and the Competent Person is Dr Alastair Goodship, Mila's Chief Operating Officer.

Mark Stephenson, Executive Chairman, said: "The most important aspect of this programme is the continuity of mineralisation at depth." He added: "The 11.85 g/t Au and 23.40 g/t Au intercepts in MYARC0225 are particularly encouraging".

Why depth and continuity matter

For an exploration company, a resource estimate is a key step because it converts individual drill intercepts into a defined body of mineralisation. The 12 October results matter for Mila's resource work in two ways. First, the 43 m interval in MYARC0224 represents a broad mineralised section. Second, the deeper intercept in the same hole, which extends mineralisation to approximately 170 m vertical depth, together with the high-grade result in MYARC0225 from 156 m, underpins the chairman's emphasis on "continuity of mineralisation at depth".

That said, the high-grade interval in MYARC0225 covers 2 m downhole, and the remaining five holes have yet to report. How the full dataset feeds into the maiden MRE, and the confidence category any estimate carries, will only become clear when the resource is published.

Funding and the broader portfolio

Mila has strengthened its position in Queensland and raised fresh capital in recent months. On 12 August 2026, it completed its option exercise with EMX Royalty Corp (now Elemental Royalty Corporation) to take 100% ownership of Yarrol, Mount Steadman and Mount Weary, which includes the Monal copper-gold prospect. The consideration was 7,096,774 new shares valued at £110,000 (1.55p), subject to a 12-month lock-up. Mark Stephenson described this as "an important milestone for Mila".

On 7 September 2026, Mila announced an oversubscribed placing raising £1.5 million gross through 125,000,000 new shares at 1.2p. Each placing share carries one warrant exercisable at 2p, which cannot be exercised before 1 March 2027 and runs for 36 months, with an accelerator if the closing mid-price is above £0.03 for ten consecutive trading days. A further 7,500,000 broker warrants were issued. The proceeds are earmarked for Yarrol resource drilling, Monal copper-gold drilling, regional Queensland exploration and working capital. Mark Stephenson said the company was delighted by the response to the fundraising from both existing shareholders and several new investors. Total voting rights after admission on 11 September 2026 were 862,560,922.

Outside Queensland, Mila (LSE:MILA) holds rights to 30% of the Kathleen Valley Project in Western Australia, with an option to move to 80%. On 26 August 2026, it announced an upgraded Inferred JORC (2012) resource at the Coffey Gold Deposit of 599,000 t @ 2.1 g/t Au for 41,300 oz, using a 0.5 g/t cut-off, compared with 21,000 oz in the November 2020 estimate.

Financial position

Mila's most recent reported accounts are its interim results for the six months to 31 December 2025, published on 4 March 2026. They showed:

  • A loss of £239,046 (prior period: £360,727).
  • Cash of £636,903, with no borrowings reported.
  • A financial year end of 30 June.

Since then, the company has announced a £600,000 placing on 16 April 2026 and the £1.5 million placing in September. The date of the final results for the year to 30 June 2026 has not been found.

Risks to weigh

Several risks stand out:

  • Exploration and execution: true widths have not been estimated, five of the nine holes are still awaiting assays, and the maiden MRE is only "targeted" for Q4 2026.
  • Dilution: the company completed two placings in 2026, and 125,000,000 placing warrants at 2p plus 7,500,000 broker warrants are outstanding.
  • Funding: as an exploration-stage company with a record of losses, Mila had cash of £636,903 at 31 December 2025, before the later raises.
  • Commodity: as a gold and copper explorer, its prospects are exposed to movements in metal prices.

The share price has been volatile. Over the past 52 weeks the shares have traded between a low of 0.85p and a high of 2.70p, and market data showed a market capitalisation of £9.70m. The current price of 1.125p is below the 1.2p September placing price.

What to watch next

  • Assays from the remaining five Yarrol North holes, expected "over the coming weeks".
  • The initial Mineral Resource Estimate at Yarrol, targeted for Q4 2026.
  • Progress on Monal copper-gold drilling and regional Queensland exploration funded by the September placing.
  • The date for final results for the year to 30 June 2026, which has yet to be confirmed.

The 12 October results give Mila evidence of both broad and high-grade gold mineralisation at Yarrol, including an extension to approximately 170 m vertical depth. Their real significance will depend on the outstanding assays and the maiden resource estimate, which will show how these intercepts translate into a defined gold inventory.